RAISED KERB TRIM – INTEGRA TRIM
Training hub – all your questions answered!
For the best results, please follow the instructions as detailed below.
If you still have questions, please feel free to contact us using the form here…
STEP 1
Before installing Raised Kerb Trim, ensure the fascia board is solid and high enough to accept the installation of the trim and, importantly, provide a strong fixing point for the PolyTop nails.
Also, ensure that at least 50mm of FlexiProof membrane is overhanging the fascia.
STEP 2
Use a roller* to apply an even coating of FlexiProof Contact Bonding Adhesive along the exposed roof deck and top of the fascia.
* When using FlexiProof Fleece Backed sheets, use FlexiProof Contact Spray Aerosol.
STEP 3
Apply an even coat of FlexiProof Contact Bonding Adhesive along the underside of the membrane.
(We recommend using a roller for FlexiProof membranes and a spray for FlexiProof Fleece Backed sheets.)
STEP 4
Carefully and evenly roll the membrane down and onto the roof deck and fascia.
Make sure to smooth out any air bubbles or creases and confirm good adhesion before progressing to Step 5.
STEP 5
Neatly snip-off any excess FlexiProof EPDM membrane overhanging
the fascia.
Fold and tuck the membrane in on the left side to create a flap.
STEP 6
Carefully peel-off the protective film from the outside surface of the length of Raised Kerb Trim to be installed.
STEP 7
Position the length of Raised Kerb Trim along the edge of the roof surface and press down and in firmly.
(This creates a watertight seal between the FlexiProof EPDM membrane and the foam sealant strip along the underside of the Raised Kerb Trim.)
STEP 8
Hold the length of Raised Kerb Trim in place and carefully hammer a 50mm PolyTop nail into every pre-drilled hole along that section.
Refollow the steps above to install the next length of Raised Kerb Trim.