Video Training
  • Tools & Equipment
  • Precautions
  • Hammer
  • Pencils
  • Safety glasses
  • Tape Measure
  • Superglue
  • Hand saw

Be careful when using superglue not to overspill as it cannot be cleaned from the Sure Edge or EPDM Rubber Roofing products.

Only apply glue to one side of the Sure Edge joining trims to prevent expansion and contraction from fracturing the Sure Edge product.

When hammering in polytop pins to secure the Sure Edge flat roof trims, use a direct hammering action to prevent slippage from the pin head resulting in denting to the Sure Edge flat roof trims.

Extreme care must be exercised when working on ladders, roofs, or at elevations above ground. If used as an emergency repair to a roofing system, contact the roofing system manufacturer for compatibility and to ensure compliance with terms and limitations of the warranty.

Surface can be slippery when wet, damp, or frost covered.

Do not expose product to temperatures in excess of 82° C (180°F).

This product is not intended for use where roof top traffic or activity is anticipated without a protective layer installed on its surface.

Step 1

 

Install the membrane with a 100mm overhang on all sides that require the check kerb trim to be installed.

Step 2

 

Hold the trim down in position and apply downward pressure to ensure that a watertight seal has been made. Secure the trims down with 50mm Polytops that have been provided through the pre-drilled fixing holes. Always leave a 2.5mm exansion between all lengths

N.B

    • If a secure fixing cannot be achieved a timber fixer should be fitted to the vertical edge of the roof.

 

  • In areas of high wind, exposed areas and high buildings additional fixings between predrilled holes is recommended.