Installation Video
  • Tools & Equipment
  • Precautions
  • Hammer
  • Pencils
  • Safety glasses
  • Tape Measure
  • Superglue
  • Hand saw

Be careful when using superglue not to overspill as it cannot be cleaned from the Sure Edge or EPDM Rubber Roofing products.

Only apply glue to one side of the Sure Edge joining trims to prevent expansion and contraction from fracturing the Sure Edge product.

When hammering in polytop pins to secure the Sure Edge flat roof trims, use a direct hammering action to prevent slippage from the pin head resulting in denting to the Sure Edge flat roof trims.

Extreme care must be exercised when working on ladders, roofs, or at elevations above ground. If used as an emergency repair to a roofing system, contact the roofing system manufacturer for compatibility and to ensure compliance with terms and limitations of the warranty.

Surface can be slippery when wet, damp, or frost covered.

Do not expose product to temperatures in excess of 82° C (180°F).

This product is not intended for use where roof top traffic or activity is anticipated without a protective layer installed on its surface.

Step 1

 

Attach the built in batten to the fascia using ring shank stainless steel nails. (If a standard wooden batten is already in place, simply use the standard backplate)

Step 2

 

Apply contact bonding adhesive to the membrane, deck and the built in batten, allow gases to evaporate from the adhesive before bringing both surfaces together

N.B

Step 3

 

Pull the membrane down over the backplate apply pressure so the membrane adheres to the backplate

Step 4

 

Fix the trim in place using the 65mm Polytop supplied in the pre drilled holes. (Note: In areas of high wind, exposed areas and high buildings additional fixings between predrilled holes is recommended.)