• Tools & Equipment
  • Roof Surface Preparation
  • Precautions
  • Hammer
  • Pencils
  • Safety glasses
  • Tape Measure
  • Superglue
  • Hand saw

The DuoPly fully-adhered system will adhere to wood, wood fibreboard and lightweight concrete. This product may NOT be applied to polystyrene insulation. The DuoPly Water Based Acrylic Adhesive is intended for bonding to timber surfaces only. Other surfaces must be bonded with DuoPly Bonding Adhesive. Roofs over 100m² must also be installed with Bonding Adhesive.

Be sure the roof surface is clean, free of dust, dirt, rust, oil, grease, and loose material. The roof surface must be dry.

This product will not adhere to wet or damp surfaces. Trapped moisture may vaporize and negatively affect the performance of this product.

Good roofing practice dictates that ponding water be prevented. The flat roof surface should have a positive slope of at least 1 in 80 to prevent ponding water conditions. Before starting please consult the “Precautions” section at the beginning of this manual.

Be careful when using superglue not to overspill as it cannot be cleaned from the Sure Edge or EPDM Rubber Roofing products.

Only apply glue to one side of the Sure Edge joining trims to prevent expansion and contraction from fracturing the Sure Edge product.

When hammering in polytop pins to secure the Sure Edge flat roof trims, use a direct hammering action to prevent slippage from the pin head resulting in denting to the Sure Edge flat roof trims.

Extreme care must be exercised when working on ladders, roofs, or at elevations above ground. If used as an emergency repair to a roofing system, contact the roofing system manufacturer for compatibility and to ensure compliance with terms and limitations of the warranty.

Surface can be slippery when wet, damp, or frost covered.

Do not expose product to temperatures in excess of 82° C (180°F).

This product is not intended for use where roof top traffic or activity is anticipated without a protective layer installed on its surface.

Step 1

Attach the built in batten to the fascia using ring shank stainless steel nails.(If a standard wooden batten is already in place, simply use the standard backplate included)

Step 2

Apply bonding adhesive to the membrane, deck and the built in batten, allow to flash off.

Step 3

Pull the membrane down over the batten and apply pressure.

Step 4

Fix the trim in place using the 65mm Polytops supplied in the pre drilled holes