EPDM Roofing Calculator

FLEXI PROOF FLEECE BACK TRAINING

PITCHED ROOF SLOPES ONTO THE FLAT ROOF

PITCHED ROOF SLOPES ONTO THE FLAT ROOF - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions below. If you still have questions please contact us using the form here. The process is the same for pitched roof with flat tops. STEP 1 Carefully strip 3 courses of tiles from the adjoining roof and remove the roofing battens. Carefully lift the existing pitched roof underlay and apply contact adhesives to the back of the membrane and to the roof...

Read more...

Fitting Wall Trims And Lead Flashing | Training Hub

FITTING WALL TRIMS & LEAD FLASHING - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions as detailed below. If you still have questions please feel free to contact us using the form here… STEP 1 Before installing the membrane, make sure the mortar is chased out of the joint to allow installation of the lead flashing or wall trim. Doing this first allows the dust to be removed and protects the membrane from damage. Make sure all dust...

Read more...

Coping Stone Detail | Training Hub

COPING STONE DETAIL - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions as detailed below. If you still have questions please feel free to contact us using the form here… STEP 1 With the coping stone removed, bond the membrane over the parapet wall leaving a 30 mm gap from the external wall face, seal the membrane edge onto a bead of water block mastic. STEP 2 Bed the coping stones over the parapet wall using a tough sand...

Read more...

Using Termination Bars To Join To Other Roofs | Training Hub

USING TERMINATION BARS TO JOIN TO OTHER ROOFS - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions as detailed below. If you still have questions, please feel free to contact us using the form here… STEP 1 Overlap the sheet onto the adjoining flat roof system by 50 mm. STEP 2 Lift up the membrane to expose the adjoining roof system and apply a thick bead of water block mastic the length or the overlap. STEP 3 Flap the sheet/membrane onto...

Read more...

Installing The 68mm – 110mm Roof Deck Drains | Training Hub

INSTALLING THE 68MM-110MM ROOF DECK DRAINS - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions below. STEP 1 Cut down the roof drain leaving a 50 mm equal flange the whole way around, drop the roof drain into the preformed hole. STEP 2 Fix the roof drain down onto the roof deck using countersunk screws. Note: if you channel out a section underneath the roof drain in the timber deck the same thickness as the plastic of the drain...

Read more...

Installing A Wall Drain | Training Hub

INSTALLING A WALL DRAIN - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions below. If you still have questions, please feel free to contact us using the form here… STEP 1 Offer the wall drain into the pre-cut hole in your parapet wall and mark around using a white pencil or scribe STEP 2 Remove the wall drain and apply a thin bead of lap edge sealant behind the drain. Once the sealant is fully applied, push the drain back...

Read more...

Pipes Through The Membrane – Pipe Box Pocket | Training Hub

PIPES THROUGH THE MEMBRANE - PIPE BOX POCKET - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions below. If you still have questions, please get in touch with us using the form. STEP 1 Ensure that the membrane around the pipe/penetration is clean, dry and free from dust or debris. Apply EPDM edge sealant where the pipe box pocket will be located. STEP 2 Clip the pipe box pocket together around the pipe/penetration and carefully lower onto the lap sealant. STEP...

Read more...

Pipes Through The Membrane – Pipe Flashing | Training Hub

PIPES THROUGH THE MEMBRANE - PIPE FLASHING - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions as detailed below. If you still have questions please contact us using the form here… STEP 1 Pull the pipe flashing firmly over the top of the pipe. Locate the ribbed band directly above the top of the pipe and cut along the top edge. Pull the pipe flashing down into its final position so that the underside tape sits on the...

Read more...

External Corner Patch | Training Hub

EXTERNAL CORNER PATCH - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions as detailed below. If you still have questions please feel free to contact us using the form here… STEP 1 Ensure the membrane around the external corner is clean, dry and free from dust or debris. Using a pencil, mark a small vertical line 60 mm from each edge of the cut membrane. STEP 2 Measure the distance between the 2 pencil lines being careful to measure...

Read more...

Internal Corner Detail | Training Hub

INTERNAL CORNER DETAIL - FLEECE-BACKED Training hub - all your questions answered! For the best results, please follow the instructions as detailed below. If you still have questions please feel free to contact us using the form here… STEP 1 Form the membrane into a 45 degree (pig’s ear) shape where the membrane meets in the internal corner. STEP 2 Cut the pig’s ear vertically 80 mm out from the flat roof corner. STEP 3 Cut a patch of 229 mm flashing tape 160 mm wide and offer over...

Read more...